|
|
|
 |
Hotel Information
For classes being held at our Lake Ridge, Virginia site, we recommend hotels south of the DC area (Woodbridge and Potomac Mills).
Country Inn and Suites Woodbridge
2621 Prince William Parkway
Woodbridge, Virginia 22192
(703) 492-6868
(888) 201-1746
http://www.countryinns.com
ProChain Discount Rates Available
|
Directions from I-95 to hotel:
Take exit 158B (Prince William Parkway) towards Manassas. Turn left at the 2nd traffic light onto Crossing Place. Hotel will be immediately to your right.
Directions from hotel to class site:
From Crossing Place turn left onto Prince William Parkway. Go 3.5 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right.
|
Courtyard Marriott Potomac Mills Woodbridge
14300 Crossing Place
Woodbridge, Virginia 22192
(703) 491-4525
(800) 321-2211
http://www.marriott.com
|
Directions from I-95 to hotel:
Take exit 158B (Prince William Parkway) towards Manassas. Turn left at the 2nd traffic light onto Crossing Place. Continue on to the Courtyard.
Directions from hotel to class site:
From Crossing Place turn left onto Prince William Parkway. Go 3.5 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
Residence Inn Potomac Mills Woodbridge
14301 Crossing Place
Woodbridge, Virginia 22192
(703) 490-4020
(800) 331-3131
http://www.residenceinn.com
|
Directions from I-95 to hotel:
Take exit 158B (Prince William Parkway) towards Manassas. Turn left at the 2nd traffic light onto Crossing Place. Continue on to the Residence Inn.
Directions from hotel to class site:
From Crossing Place turn left onto Prince William Parkway. Go 3.5 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
Fairfield Inn Potomac Mills/Woodbridge
2610 Prince William Parkway
Woodbridge, Virginia 22192
(703) 497-4000
(800) 228-2800
http://www.fairfieldinn.com
|
Directions from I-95 to hotel:
Take exit 158B (Prince William Parkway) towards Manassas. Cross Telegraph Road. The Fairfield Inn is on the right, directly behind the Shell Gas Station.
Directions from hotel to class site:
From the Fairfield Inn parking lot, turn right onto Prince William Parkway. Go 3.5 mile. Turn right onto Old Bridge Road. At the 2nd light turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
Wytestone Suites of Potomac Mills
14525 Gideon Drive
Woodbridge, Virginia 22192
(703) 490-4100
(888) 747-8100
http://www.wytestone.com
|
Directions from I-95 South to hotel:
Take Exit 156 Dale City. Stay in the right lane on the exit ramp. Hotel will be on your left.
Directions from hotel to class site:
Go northeast on Gideon Drive towards Town Center Road. Go 0.2 mile. Turn left onto Smoketown Road. Go about 1 mile. Turn left onto Prince William Parkway. Go about 3 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
Holiday Inn Express Hotel & Suites
14030 Telegraph Road
Woodbridge, Virginia 22192
(703) 576-1600
(800) 377-8660
http://www.hiexpress.com
|
Directions from I-95 to hotel:
Take Exit 158B Prince William Parkway towards Manassas. Turn left at the second light onto Telegraph Road. Hotel is on the right.
Directions from hotel to class site:
Turn left onto Telegraph Road. Turn left onto Prince William Parkway. Go 3.5 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
Sleep Inn Potomac Mills
14080 Shoppers Best Way
Woodbridge, Virginia 22192
(703) 580-9200
(800) 753-3746
http://www.hotelchoice.com
|
Directions from I-95 to hotel:
Take exit 158B (Prince William Parkway) towards Manassas. Cross Telegraph Road. Turn left onto Shoppers Best Way. The Sleep Inn is on the right.
Directions from hotel to class site:
From the Sleep Inn, turn left onto Shoppers Best Way. Turn left onto Prince William Parkway. Go 3.5 miles. Turn right onto Old Bridge Road. Go 1.5 miles. Turn left onto Hedges Run Drive. Take first left onto Commission Court. 3460 is on the right. |
|
Back to top
|
|
|
| Questions or problems regarding this web site should be directed to us here.
View our privacy policy.
ProChain is a registered trademark of ProChain Solutions, Inc.
Other products or names mentioned on this page are registered trademarks or trademarks of their respective companies.
Copyright © 1998 - 2010 ProChain Solutions, Inc. All rights reserved. |
|
|
|
|
 |
|
|