Client List

Our clients come in many sizes and from many industries. Our software is a 12th generation product with tens of thousands of users in hundreds of organizations worldwide. We have implemented the ProChain Project Management methodology with scores of companies.

This is a partial list of organizations that have used our products; some of our clients prefer not to publicize their involvement with ProChain in order to protect the strategic advantage we provide.

Aerospace and Defense

  • Aerojet Corporation
  • Air Force Institute of Technology
  • Airshow Inc.
  • BAE Systems
  • The Boeing Company
  • Embraer
  • General Dynamics
  • Halliburton
  • Hawker Beechcraft
  • ITT Space Systems
  • NASA
  • Northrop Grumman
  • Portsmouth Naval Shipyard
  • Puget Sound Naval Shipyard
  • Raytheon
  • SAAB Avionics
  • Timco
  • US Air Force

Consumer Products

  • Clopay
  • Coca-Cola
  • Colgate Palmolive
  • Del Monte Foods
  • Fonterra
  • Gillette
  • Heineken
  • Henkel
  • IKEA Trading und Design
  • Kraft Foods
  • McKee Foods
  • Nike
  • Philip Morris

Education

  • Academia de Studii Economic Bucuresti
  • Admin. Staff College of India
  • Arkansas Tech University
  • Ashridge Management College
  • Bar Ilan University
  • Baylor University
  • Bellarmine University
  • BES Las Salle EDU
  • Bogazici University
  • Cairo University
  • Cameron University
  • Case Western Reserve University
  • Chonbuk National University
  • Chung-Hua University
  • City University
  • Cleveland State University
  • Coastal Carolina University
  • College of William & Mary
  • Community College of Allegheny County
  • Cranfield University
  • Czech University of Agriculture in Prague
  • Davenport University
  • Democritus University of Thrace
  • DeVry University
  • Disney/University of Central Florida
  • East Carolina University
  • Embry-Riddle Aeronautical University
  • Fachhochschule Augsburg – University of Applied Sciences
  • Federal University of Rio de Janeiro
  • Federal University of Sao Carlos
  • Florida Institute of Technology
  • Folkuniversitetet
  • George Fox University
  • Hong Kong Polytechnic University
  • Huazhong University of Science & Technology
  • Hull University
  • Indian Institute of Technology
  • Indiana University
  • INSEAD
  • Interamerican University
  • International Institute for Learning
  • Iowa State University
  • Israel Institute of Technology
  • ITT Technical Institute
  • John Carroll University
  • Kangwon National University
  • Karel de Grote Hogeschool
  • Katholieke Universiteit Leuven
  • Lake Superior State University
  • Lamar University
  • Lancaster University
  • London Business School
  • Louisiana State University
  • Lund University
  • Massachusetts Institute of Technology
  • Massey University
  • Mercy College
  • Michigan Technological University Middle East Technical University
  • Milwaukee School of Engineering
  • Minghsin Institute of Technology
  • Minnesota State University, Moorhead
  • Mississippi State University
  • Missouri State University
  • Morehead State University
  • Nanjing University of Science and Technology
  • National Taipei University of Technology
  • New University of Lisbon
  • Nottingham Trent University
  • Penn State University
  • PMI, Eastern Iowa Chapter
  • Project Management Institute
  • Pukyong National University
  • Purdue University
  • RMIT University
  • Royal Melbourne Institute of Technology
  • Royal University of London
  • Saint Xavier University
  • San Jose State University
  • Seoul National University of Technology
  • Sheridan College
  • Silesian Politechnic University
  • Slovak Technical University
  • Sofia University
  • South Dakota State University
  • St. Edwards University
  • St. Martins University
  • Stanford University
  • State University College at Buffalo
  • Stevens Institute of Technology
  • South Kent College
  • Technical University of Crete
  • Technical University of Kosice
  • Technical University of Koszalin
  • Technical University of Lublin
  • Temple University
  • Texas Tech University
  • The George Washington University
  • TOC R&D Institute
  • Uludag Universitesi
  • UMIST & University of Manchester
  • University of Applied Sciences and Arts – Dortmund
  • Universad Politencnica de Cataluna
  • Universidad Colombia Sede Manizales
  • Universidad de Costa Rica
  • Universidad de Rio de Janeiro
  • Universidad Nacional del Sur
  • Universidad Politecnica de Madrid
  • Universidade de Sao Paulo
  • Universidade Moderna
  • Universidade NOVA de Lisboa
  • Universite de Nice-Sophia Antipolis Division
  • University College London
  • University of Alaska Fairbanks
  • University of Applied Sciences
  • University of Bath
  • University of Brescia
  • University of California
  • University of California Irvine
  • University of Cincinnati
  • University of Costa Rica
  • University of Dayton
  • University of Durham
  • University of Georgia
  • University of Herts
  • University of International Cooperation
  • University of Karlsruhe
  • University of Kosice
  • University of Limerick
  • University of Ljubljana
  • University of Maryland`
  • University of Michigan
  • University of Miskolc
  • University of Natal
  • University of Navarra
  • University of North Texas
  • University of Paisley Scotland
  • University of Pennsylvania
  • University of Phoenix
  • University of Quebec
  • University of Sherbrooke
  • University of South Australia
  • University of Stellenbosch
  • University of Teesside
  • University of Tennessee
  • University of Texas
  • University of Toronto
  • University of Twente
  • University of Ulsan
  • University of Ulster
  • University of Warwick
  • University of West Bohemia CZ
  • University of Wisconsin
  • University of Zagreb
  • University of Zaragoza
  • University of Zilina
  • Universutat Internatacional de Catalunya
  • Victoria University of Wellington
  • Villanova University
  • Washington State University
  • Wayne State University
  • West Bohemia University
  • Western Carolina University
  • Western Wyoming University
  • Worcester Polytechnic Institute
  • Wuhan University of Technology China

High Tech

  • 3M
  • Advasense Technologies
  • Agilent Technologie
  • AMCC
  • AMD
  • Avaya
  • Avitronics
  • Barco
  • Bell Canada
  • BT Radianz
  • Computer Sciences Corp
  • Cray, Inc.
  • ECI Telecom Ltd.
  • Eclozion Informatique
  • Ericsson
  • Estonian Telephone
  • Fairchild Semiconductor
  • Graftech
  • Hewlett Packard
  • Hitachi Computer Products
  • Honeywell
  • IBM
  • Ismeca Europe Semiconductor
  • ITT Canon
  • L-3 Communication Systems
  • LSI Logic
  • Lucent Technologies
  • Marvell
  • Medtronic, Inc.
  • Microsoft
  • Motorola
  • Numonyx
  • Philips Semiconductors
  • Pioneer
  • Qualcomm
  • RSA Security
  • SanDisk
  • Sapient
  • Seagate Technology LLC
  • Sony Ericsson Mobil Communications
  • Spirent Communications
  • Sprint
  • Sun Microsystems
  • Symbian
  • Tadiran Spectralink
  • Tektronix
  • Tellabs
  • Tripod Data Systems, Inc.
  • TT Technologies
  • Tundra Semiconductor
  • Tyco Electronics
  • Workscape
  • Xerox Corporation

Industrial

  • ABB
  • Accoat
  • Advanced Energy Technology
  • Alcatel
  • Alfa Lava
  • American Rubber Products
  • Applied Plasmonics
  • AREVA
  • Atomic Energy of Canada Ltd.
  • Balfour Beatty
  • Bimba Manufacturing
  • Bosal
  • Bosch Rexroth Ltda.
  • Brice Manufacturing
  • BVR Technologies Company
  • C.F. Roark Welding & Engineering Co. Inc.
  • Callaway Golf
  • Celite Corporation / World Minerals Columbia Industries
  • Conoco
  • Corning Cable Systems
  • Cueros Industrializados del Bajio S.A.
  • DaimlerChrysler UK
  • Danfoss
  • Delta Faucet Company
  • Detroit Diesel Reman-West
  • DuPont
  • Eastman Kodak Company
  • ExxonMobil Chemical
  • Fisher Controls
  • Fluid Brasil Sistemas E Tecnologia
  • Fluke Corporation
  • Fuel Cell Energy
  • GE Industrial Systems
  • Hach
  • Honda
  • ITT Corporation
  • Kawasaki Heavy Industries, Ltd.
  • M&M Precision Systems
  • Marshall Industries
  • Merichem Chemicals & Refinery Services
  • Milwaukee Forge
  • Raychem
  • Rolls Royce
  • Siemens
  • Sylvania
  • Unilever
  • UPC Technology
  • Volvo

Life Sciences

  • Abbott Labs
  • Adirondack Oral & Maxillofacial Surgery
  • AHIS-St. Vincent Health
  • AMGEN
  • Andover Healthcare Inc.
  • Arterain Medical
  • Baxter
  • Boston Scientific
  • Central Dupage Health
  • Bovis Pharmaceuticals
  • Converge Medical Inc.
  • Cytori Therapeutics, Inc.
  • Edwards Lifescience
  • Ethicon
  • Gambro Healthcare
  • GlaxoSmithKline
  • Johnson & Johnson
  • Medtronic
  • Merck Medco Managed Care
  • Pharmacia
  • Roche Diagnostics
  • Spectranetics
  • Tenet Health Care
  • Tyco Healthcare
  • United Behavioral Health
  • Vascore Medical
  • Ventana